Quanterion IT Solutions
Cart is emptyRetrieve a Cart
Quanterion Solutions IncorporatedWednesday, May 22, 2013 
   Quanterion Home   Products   Solutions   Training   Publications   Downloads   About Quanterion
Quick Links
 Software Tools
   • Quanterion Automated
     Reliability Toolkit (QuART)

   • REPERTOIRE
   • 217Plus
   • Reliability Self-Assessment
     Tool (RASTER)

 Knowledge Sources
   • Cyber Security and
     Information Systems Information
     Analysis Center (CSIAC)

   • Reliability Information
     Analysis Center (RIAC)

   • Reliability Toolkits
   • Reliability Ques
   • Training
 FREE Resources
   • Quanterion RMQ Brochure [pdf]
   • QuART Demo
   • Mil Stds/Hdbks
   • MIL-HDBK-217
   • FAA-HDBK-006A
   • Lunchtime Learning
   • Recommended Texts
   • RMQ Links
   • Reliability Self-assessment
   • "QuICKER" Online Training
 Quanterion
   • How We Can Help
   • Contract Vehicles
   • Experience
   • Doing Business
   • How To Find Us
   • Contact




 811 Court Street
 Utica NY 13502-4096
 Phone: 315.732.0097
 Toll free: 877.808.0097
 FAX: 315.732.3261
 qinfo@quanterion.com
   Quanterion Virtual Bookstore
 


Virtual Bookstore Citation
Title
AN ANALYSIS OF THE F/A-18 E/F INTEGRATED READINESS SUPPORT TEAMING (FIRST) PROGRAM (DRAFT)

Author(s)
Bellos, Laura L.; Mai, Brian A.

Corporate Author(s)
NAVAL POSTGRADUATE SCHOOL MONTEREY CA

Report Date
6/1/2001

Page Count
99

Abstract
Department of Defense logistics are under increasing pressure to reduce their cost of operations. As a result of many years of reliability and aging aircraft issues facing our Naval Aviation Fleet, a maintenance support contract has been developed to attempt to maintain the high reliability of the F/A-18 E/F type aircraft. Although contract logistics support has been around since World War II, the F/A-18 E/F Integrated Readiness Support Teaming program (FIRST) has extended this support to a new level as the contractor virtually assumes the role as the Inventory Control Point for this aircraft. This research examines F/A-18 E/F program reliability and supportability issues. We assess the FIRST contract with particular regard to how this contract will affect the parts supportability aspects as well as the maintainability/reliability rates of the aircraft and life cycle costs. An important part of this research effort is the literature review. As yet, there are no studies available on the FIRST draft that might have assisted in evaluating the program. We obtained copies of the FIRST draft along with the Task Description Document and the Awards Fee Plan. The resulting analysis and conclusions discuss these elements and provide recommendations for improvement.

Price: $9.95 Available as PDF for download.
Buy Now
 


Prices are plus sales tax when purchased within New York State and shipping charges, if applicable

Copyright © 2000-2013 Quanterion Solutions Incorporated
This site is best viewed in IE 8.0 or higher, Firefox 3.0 or higher, and Google Chrome.

View Table of Contents Pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82